Zog Rails Support

Zog Rails Support

This vertical piece will support Zog Rails.

It shall be installed very close to Caret Splitter Feeder Extension Reflection Lower Right Protection, with its foot between Left Side Small Landing Zone and the Lower Curver off the Lowest Small-Medium Splitter.

History:

  • 2022 Apr 27: Mr McGlue heads over to glue it once Doctor Sugar holds it

2022 apr 27 or so mr mcglue finished 18poss

2022 apr 05 doctor sugar holding zog rails support 1000

  • 2022 Mar 15: Candy Mama reached the top of the first ramp.

2022 mar 15 candy mama bringing zog rails support

  • 2022 Mar 08: Candy Mama brought the support up the first ramp.

2022 mar 08 candy mama bringing zog rail support

Zog Rails Support made by: